Objectiv: Under the programme of technical modernization of TGC-11 OJSC, to expand the peak reserve boiler (PRB) using gas turbine technology.
1
Design
2
Supply of equipment
3
Construction and installation work and pre-commissioning work
4
Commissioning of the facility
Name: Gas turbine plant with capacity 16 MW (GTP-16 MW) with exhaust heat boiler
Location: GTP-CHP is located on the territory of operating PRB (peak reserve boiler) of TB (Tomsk Branch) of TGC-11 OJSC
General information:
Gas turbine plant is designed for generation of electric power with capacity 16 MW and its output to the grid.
Effective gas pressure for GTP is ensured by boosting compressor stations. Heat output is made to existing heating networks of PRB.
Technical and economic indices of commissioned capacity:
Electrical capacity......... 16 MW.
Fuel ......................................... Gas.
Operation mode ................ Intermediate.
Расскажите о вашей задаче
Напишите нам, если у вас возникли вопросы по нашей деятельности
или вы хотите оставить заявку на расчет проекта.
Или позвоните: +7 (812) 331-53-36
или вы хотите оставить заявку на расчет проекта.
Или позвоните: +7 (812) 331-53-36