Implemented works
Construction
Type of works:  General contract
Contract type:  ЕРС
Customer :   TGC-11 OJSC
100%
Implementation status
4/10
Level of Complexity
6/10
Scale of Project

Objectiv: Under the programme of technical modernization of TGC-11 OJSC, to expand the peak reserve boiler (PRB) using gas turbine technology.

1
Design
2
Supply of equipment
3
Construction and installation work and pre-commissioning work
4
Commissioning of the facility

Name: Gas turbine plant with capacity 16 MW (GTP-16 MW) with exhaust heat boiler

Location: GTP-CHP is located on the territory of operating PRB (peak reserve boiler) of TB (Tomsk Branch) of TGC-11 OJSC

General information:

Gas turbine plant is designed for generation of electric power with capacity 16 MW and its output to the grid.

Effective gas pressure for GTP is ensured by boosting compressor stations. Heat output is made to existing heating networks of PRB.

Technical and economic indices of commissioned capacity:

Electrical capacity......... 16 MW.

Fuel ......................................... Gas.

Operation mode ................ Intermediate.